{"id":33552,"date":"2026-06-21T06:30:00","date_gmt":"2026-06-21T11:30:00","guid":{"rendered":"https:\/\/www.ecoticias.com\/en\/?p=33552"},"modified":"2026-06-21T02:10:16","modified_gmt":"2026-06-21T07:10:16","slug":"a-heavy-lift-ship-is-heading-to-hobart-to-pick-up-the-worlds-largest-battery-electric-ferry-for-south-america-and-the-scale-point-is-that-the-vessel-is-about-430-feet-long-and-built-to-carry","status":"publish","type":"post","link":"https:\/\/www.ecoticias.com\/en\/a-heavy-lift-ship-is-heading-to-hobart-to-pick-up-the-worlds-largest-battery-electric-ferry-for-south-america-and-the-scale-point-is-that-the-vessel-is-about-430-feet-long-and-built-to-carry\/33552\/","title":{"rendered":"A heavy-lift ship is heading to Hobart to pick up the world\u2019s largest battery-electric ferry for South America, and the scale point is that the vessel is about 430 feet long and built to carry around 2,100 passengers on the Argentina-Uruguay route"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A heavy-lift ship is heading to Hobart, Tasmania, for an unusual job. The <em>MV Black Marlin<\/em> will pick up<a href=\"https:\/\/incat.com.au\/vessel\/hull-096\/\" target=\"_blank\" rel=\"noopener\"> China Zorrilla<\/a>, the world\u2019s largest battery-electric ferry, and carry it to South America before it begins service between Argentina and Uruguay.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ferry is not crossing the ocean on its own because it was built for a calmer river route, not rough open seas. That simple detail turns a clean-transport <a href=\"https:\/\/www.ecoticias.com\/en\/goodbye-to-diesel-british-scientists-develop-an-engine-that-runs-on-seawater-and-promises-to-revolutionize-maritime-and-land-transport\/26679\/\">milestone<\/a> into a massive shipping puzzle, with tugboats, ballast water, a custom cradle, and a loading operation expected to take several days.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A ferry too special to sail itself<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The 427-foot catamaran was built by Hobart-based Incat for South American operator<a href=\"https:\/\/www.buquebus.com\/info\/buque-electrico\" target=\"_blank\" rel=\"noopener\"> Buquebus<\/a>. Once in service, it is expected to carry up to 2,100 passengers and 225 cars between Buenos Aires and Colonia del Sacramento, a busy River Plate crossing where ferries are part of everyday life.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For passengers, the change may not feel like a science project. It may feel more like a quieter dock, fewer<a href=\"https:\/\/www.ecoticias.com\/en\/less-sulfur-more-heat-the-reduction-in-maritime-emissions-caused-global-warming-to-exceed-expectations\/26540\/\"> exhaust fumes<\/a> around boarding lanes, and a different kind of ferry ride across familiar water.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why Black Marlin matters<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <em>Black Marlin<\/em> is no ordinary cargo ship. It is about 712 feet long and 138 feet wide, large enough to carry huge marine structures, and it is expected to be one of the biggest vessels to enter the River Derwent.<\/p>\n\n\n\n<div class=\"gb-element-a00da4e5\">\n<div><div class=\"gb-looper-46613eed\">\n<div class=\"gb-loop-item gb-loop-item-a8390598 post-33557 post type-post status-publish format-standard has-post-thumbnail hentry category-technology resize-featured-image\">\n<h3 class=\"gb-text gb-text-24a51617\">Read More: <a href=\"https:\/\/www.ecoticias.com\/en\/france-is-warning-that-china-is-building-strange-new-structures-deep-in-the-desert-to-reinforce-nuclear-deterrence-and-what-stands-out-is-that-the-shapes-look-deliberate-enough-to-signal-preparation\/33557\/\">They warn that China might be building strange new structures deep in the desert to reinforce its nuclear deterrence, and what draws attention is that the shapes seem deliberate enough to indicate preparation, not just construction<\/a><\/h3>\n<\/div>\n<\/div><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Robert Clifford, the shipyard\u2019s chairman, said, \u201cVery few people ever get the chance to see an operation like this up close.\u201d He also said the <em>Black Marlin<\/em> itself is an extraordinary vessel and will rank among the largest ships to enter the river.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How the loading works<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">So how do you put one ship on top of another? The <em>Black Marlin<\/em> is<a href=\"https:\/\/boskalis.com\/about-us\/fleet-and-equipment\/offshore-vessels\/semi-submersible-heavy-transport-vessels\" target=\"_blank\" rel=\"noopener\"> semi-submersible<\/a>, which means it can lower its cargo deck below the water by taking on ballast, then rise again after the cargo is positioned.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The China Zorrilla will be guided into place with help from tugboats. A cradle will be built on the <em>Black Marlin<\/em>\u2019s deck, almost like setting up a floating dry dock, before the water is pumped out and the ferry is chained down for the trip.<\/p>\n\n\n\n<div class=\"gb-element-14681b87\">\n<div><div class=\"gb-looper-f7156942\">\n<div class=\"gb-loop-item gb-loop-item-043e0503 post-33507 post type-post status-publish format-standard has-post-thumbnail hentry category-science resize-featured-image\">\n<h3 class=\"gb-text gb-text-46dc86a7\">Read More: <a href=\"https:\/\/www.ecoticias.com\/en\/geologists-studied-sand-from-the-d-day-beaches-in-normandy-and-uncovered-a-lingering-signature-of-wartime-debris-proof-that-history-can-stay-embedded-in-the-shoreline-for-decades\/33507\/\">Geologists studied sand from the D-Day beaches in Normandy and uncovered a lingering signature of wartime debris, proof that history can stay embedded in the shoreline for decades<\/a><\/h3>\n<\/div>\n<\/div><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The loading will need deep water because the heavy-lift ship will sit about 75 feet below the surface when partly submerged. The exact spot will be determined by TasPorts, with the area near Taroona considered more likely than anywhere close to the Tasman Bridge.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A battery-powered giant<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><em>China Zorrilla<\/em> is powered by more than 5,000<a href=\"https:\/\/www.ecoticias.com\/en\/the-battery-that-was-due-to-arrive-in-september-2026-with-350-wh-kg-and-dizzying-figures-has-just-taken-an-unexpected-turn\/25159\/\"> batteries<\/a>, giving it about 90 minutes of operation on its planned route. Its installed storage system is listed at about 41 megawatt-hours, a term that simply means a very large amount of stored electrical energy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ferry uses eight electric waterjets supplied through technology from<a href=\"https:\/\/www.wartsila.com\/marine\/products\/ship-electrification-solutions\/case-incat-tasmania\" target=\"_blank\" rel=\"noopener\"> W\u00e4rtsil\u00e4<\/a>. Waterjets push water out the back of the vessel to move it forward, which is why they are often used on fast ferries.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the end of the day, the idea is simple enough. Instead of burning fuel during the river crossing, the ferry runs on battery power, then charges at port before going again.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Delays changed the plan<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The ferry went through sea trials in January and was expected to be ready for delivery by April. Then logistics got messy after the original heavy-lift ship became stuck in the Persian Gulf because of conflict in the region.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company considered other options, including putting diesel generators on board to power the<a href=\"https:\/\/www.ecoticias.com\/en\/its-not-about-lithium-or-batteries-the-problem-driving-up-the-cost-of-electric-cars-and-wind-power-might-lie-in-a-tiny-magnet-and-a-new-ai-has-already-found-a-way-to-do-without-rare-earth-e\/30587\/\"> electric motors<\/a>. That would have changed the delivery plan and raised concerns about the vessel\u2019s structure.<\/p>\n\n\n\n<div class=\"gb-element-152eefbc\">\n<div><div class=\"gb-looper-96292a87\">\n<div class=\"gb-loop-item gb-loop-item-9df19a1d post-33474 post type-post status-publish format-standard has-post-thumbnail hentry category-technology resize-featured-image\">\n<h3 class=\"gb-text gb-text-41c8b3a2\">Read More: <a href=\"https:\/\/www.ecoticias.com\/en\/a-2026-building-method-promises-a-full-house-in-five-days-skipping-bricks-and-conventional-dry-construction-with-a-system-designed-for-speed\/33474\/\">A 2026 building method promises a full house in five days, skipping bricks and conventional dry construction with a system designed for speed<\/a><\/h3>\n<\/div>\n<\/div><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">David Riseley, head of projects, said, \u201cIt\u2019s not just about battery capacity.\u201d He explained that the ferry was built for a relatively calm river, not for heavy sea operation, which is why waiting for another heavy-lift vessel made sense.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A test for future ferries<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This operation is more than a one-time spectacle on the Derwent River. The new ferry\u2019s design has already drawn interest from other operators, and Danish company<a href=\"https:\/\/incat.com.au\/incat-tasmania-and-molslinjen-sign-contract-for-third-battery-electric-high-speed-ferry\/\" target=\"_blank\" rel=\"noopener\"> Molslinjen<\/a> has ordered another battery-electric ferry after commissioning two related vessels.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is why this shipment matters. If the loading and voyage work as planned, the project could become a practical example for moving future large electric ferries from specialized shipyards to the routes where they are needed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The trip from Hobart to Buenos Aires is expected to take about 30 to 40 days. After that, <em>China Zorrilla<\/em> will still need to enter service, but the hardest part may turn out to be getting the world\u2019s largest electric ferry to the place where passengers can finally board it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The official announcement has been published by<a href=\"https:\/\/incat.com.au\/heavy-lift-vessel-on-route-to-hobart-to-collect-hull-096\/\" target=\"_blank\" rel=\"noopener\"> <em>Incat<\/em><\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A heavy-lift ship is heading to Hobart, Tasmania, for an unusual job. The MV Black Marlin will pick up China &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"A heavy-lift ship is heading to Hobart to pick up the world\u2019s largest battery-electric ferry for South America, and the scale point is that the vessel is about 430 feet long and built to carry around 2,100 passengers on the Argentina-Uruguay route\" class=\"read-more button\" href=\"https:\/\/www.ecoticias.com\/en\/a-heavy-lift-ship-is-heading-to-hobart-to-pick-up-the-worlds-largest-battery-electric-ferry-for-south-america-and-the-scale-point-is-that-the-vessel-is-about-430-feet-long-and-built-to-carry\/33552\/#more-33552\" aria-label=\"Read more about A heavy-lift ship is heading to Hobart to pick up the world\u2019s largest battery-electric ferry for South America, and the scale point is that the vessel is about 430 feet long and built to carry around 2,100 passengers on the Argentina-Uruguay route\">Read more<\/a><\/p>\n","protected":false},"author":19,"featured_media":33553,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-33552","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mobility","resize-featured-image"],"_links":{"self":[{"href":"https:\/\/www.ecoticias.com\/en\/wp-json\/wp\/v2\/posts\/33552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ecoticias.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ecoticias.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ecoticias.com\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ecoticias.com\/en\/wp-json\/wp\/v2\/comments?post=33552"}],"version-history":[{"count":1,"href":"https:\/\/www.ecoticias.com\/en\/wp-json\/wp\/v2\/posts\/33552\/revisions"}],"predecessor-version":[{"id":33554,"href":"https:\/\/www.ecoticias.com\/en\/wp-json\/wp\/v2\/posts\/33552\/revisions\/33554"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ecoticias.com\/en\/wp-json\/wp\/v2\/media\/33553"}],"wp:attachment":[{"href":"https:\/\/www.ecoticias.com\/en\/wp-json\/wp\/v2\/media?parent=33552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ecoticias.com\/en\/wp-json\/wp\/v2\/categories?post=33552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ecoticias.com\/en\/wp-json\/wp\/v2\/tags?post=33552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}